What We Do

Services

Everything we build, repair, and waterproof, with the details that actually matter.

Home › Services

Everything we take on

Every job below is one we do ourselves across Costa Mesa.

Deck Installation

We frame new decks on concrete piers or footings poured below grade, then build up with pressure-treated joists spaced at 16 inches on center. Board choice, railing style, and stair placement all get worked out before we pour anything, not after.

Deck Repair

Most repair calls start with a soft spot underfoot or a post that's started to lean. We pull the decking back far enough to see the joists and ledger, replace what's rotted, and only re-skin over framing that's actually sound.

Deck Staining and Sealing

Costa Mesa sun breaks down sealer faster than people expect, usually inside two to three years on a south-facing deck. We pressure wash, let the wood dry out fully, then apply a penetrating stain and sealer rated for UV, not a film-forming product that'll just peel later.

Custom Deck Design

If you want something beyond a rectangle off the back door, we'll lay out multiple levels, built-in benches, or a pergola tied into the structure. We draw it to scale first so you're approving a plan, not guessing from a sketch.

Deck Waterproofing

Decks built over a garage, patio, or interior room need a true waterproof membrane under the walking surface, not just a coating sprayed on top. We lap and seal every penetration, slope the deck to drain, and flash it at the house connection so water has nowhere to get in.

Composite Deck Installation

Composite boards don't rot and don't need staining, which is why a lot of homeowners switch after their second round of sanding a wood deck. We still frame it in pressure-treated lumber underneath, since composite is a surface material, not a structural one.

Deck Board Replacement

Sometimes the frame is fine and only the decking is shot, cupped boards, popped fasteners, gray weathered wood. We swap the boards, check the joists underneath while they're exposed, and match spacing so the new run doesn't look patched in.

Deck Railing Repair

Loose balusters and a wobbly top rail usually mean the posts were never bolted through the rim joist in the first place. We rebuild to current spacing code, a 4 inch gap max between balusters, so it passes inspection and actually holds weight.

Raised Deck and Balcony Waterproofing

Second-story decks and balconies over living space are where a small leak turns into a drywall and mold problem inside the house. We install a fully adhered waterproof membrane, not a brush-on coating, and test the slope and drains before anyone walks on it.

Deck Demolition and Rebuild

When a deck's framing is too far gone to patch, it's cheaper in the long run to tear it out and start over. We haul off the old lumber and old fasteners and check the ledger and house framing underneath before building back.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Costa Mesa, CA

Deck and waterproofing work scheduled throughout this part of Orange County.

Costa Mesa, CA
Long Beach, CA
Anaheim, CA
Santa Ana, CA
Irvine, CA
Huntington Beach, CA
Garden Grove, CA
Fullerton, CA
Orange, CA
Newport Beach, CA
Tustin, CA
Common Questions

Things worth asking

Questions that come up once a project is actually underway.

Do I need a permit for a new deck?
Most raised decks and any deck attached to the house require a building permit in Orange County cities, including Costa Mesa. Ground-level decks under a certain height sometimes qualify for exemptions, but checking with the local building department before starting avoids problems at resale.
How long does a deck project take to build?
A standard single-level deck typically takes one to two weeks from the start of framing to the final board. Waterproofed raised decks and multi-level designs with stairs and built-ins can run three to four weeks.
Can you work within a set budget?
Decking material and railing style can both be adjusted to hit a target budget without changing the footprint or structural layout. Pressure-treated lumber costs considerably less than composite or hardwood, which gives the most room to move.
Do you offer a warranty on deck work?
Workmanship on framing, decking, and waterproofing is typically covered for a set period after completion, with specific terms spelled out in the written quote. Decking material itself often carries a separate manufacturer's warranty, particularly with composite products.
Who do I deal with day to day during the project?
A single point of contact handles scheduling and questions throughout a deck project rather than passing the homeowner between different people. Site visits and material decisions get coordinated directly with that contact.
What decking materials do you work with?
Pressure-treated pine, cedar, redwood, and composite brands like Trex and TimberTech are all commonly used, each with different cost and maintenance tradeoffs. Framing underneath is typically pressure-treated regardless of what decking material sits on top.
Can I still use my yard or house while the work is happening?
Most of a deck project happens outside and doesn't require access to the interior of the house, except when a ledger board connection or waterproofing tie-in needs attention near a door or window. The yard itself is usually off-limits to foot traffic near the active work area until decking and railings are secured.
How should I prepare the site before work starts?
Clearing patio furniture, potted plants, and anything stored under an existing deck gives the crew clear access to the work area. Moving vehicles away from the driveway on delivery days also helps when lumber or composite material gets dropped off.
What happens if you find rot or damage once the old deck is opened up?
Hidden rot at a ledger board, support post, or rim joist comes up often enough on repair and rebuild jobs that it's treated as an expected possibility rather than a surprise. Any additional repair work gets priced and approved before proceeding, rather than added to the bill afterward.
How do I maintain a deck after it's finished?
Wood decks typically need restaining every two to three years in a sunny coastal climate, and faster on south-facing surfaces. Composite decking only requires periodic washing, while waterproofed membrane surfaces should be checked yearly for debris buildup around drains.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (714) 831-5465